Palladio Industries Rail Facility
A scalable rail facility designed today with tomorrow’s expansion tracks already in mind.
Project Highlights
- Designed approximately 1,754 feet of new industrial rail track
- Connected facility operations through a new AREMA No. 9 turnout
- Included sliding derail protection and end-of-track safety features
- Coordinated rail infrastructure with future loadout and scale operations
- Designed improvements to the existing lead track through raise-and-tamp work
- Integrated drainage structures, utility crossings, fencing, and access improvements
- Preserved corridor space for future Tracks B, C, and D expansion
- Produced construction-ready engineering plans and profiles

Project Details
Via Rail Engineering provided engineering and design services for a new rail-served industrial facility at Central Pointe Rail Park in Temple, Texas. The project was developed to support Palladio Industries’ rail operations and future site expansion while creating efficient rail access for industrial loading and unloading activities.
The rail design included approximately 1,754 feet of new Track “A” construction connected to the existing rail network through a new AREMA No. 9 turnout. The project also incorporated a sliding derail, end-of-track protection, rail-served loading infrastructure, and improvements to the existing lead track to support safe and efficient rail operations throughout the facility.
In addition to track design, the project required extensive coordination with site grading, drainage infrastructure, utility crossings, roadway access, fencing, and future facility development. The design accommodated a future loadout and scale facility while preserving space for planned expansion tracks and additional rail-served operations within the industrial park.
Via Rail Engineering developed a comprehensive construction package that integrated rail infrastructure with the broader industrial site plan, providing the owner with a scalable rail-served facility designed to support current operations and long-term growth.
LOCATION: TEMPLE, TEXAS
Services Used:
- Rail Infrastructure Design
- Industrial Track Design
- Rail Facility Planning
- Railroad Coordination
- Site Development Coordination
- Drainage & Utility Coordination
- Construction Documentation





